Extension Foundations Near a Neighbour: What to Check Before Digging

The foundation trench is often the part of an extension that raises the biggest party wall question. It is not enough to know that the new wall is on your land: the position and depth of the excavation compared with neighbouring structures matter too.

Practical guidance · England & Wales · Independent service

single storey extension foundations - excavated foundation trench beside a brick house and neighbouring garden
Short answer

Excavating near a neighbour does not automatically require notice. Section 6 applies where particular distance and depth tests are met; obtain foundation details before deciding. Our £4.99 builder does not generate section 6 notices.

Focus: single storey extension foundations. This guide looks at the details that can change the legal position rather than assuming every homeowner needs a notice.

Measure from the neighbour’s structure, not just the fence

A fence often marks an approximate garden boundary, but the three-metre provision is concerned with the distance from the neighbouring building or structure. Ask the designer to show the neighbouring wall, your proposed trench and the measurement between them on a plan. Where a boundary is uncertain, do not treat a garden fence as proof of the legal property line.

Compare the depth of the two sets of foundations

Under the three-metre test, excavation within three metres can be notifiable where it goes deeper than the bottom of the adjoining owner’s foundations. The six-metre provision is different: it concerns an excavation that falls within the statutory 45-degree plane from the bottom of the neighbour’s foundations. A drawing showing only the proposed footprint cannot settle these questions. Existing foundation depths may need checking by an appropriate professional.

Gather the drawings before serving any notice

For section 6 the proposed excavation’s location and depth must be shown using plans and sections, and the notice must state whether underpinning or other protection is proposed. A builder’s one-line quote for “strip footings” is not a substitute for the required information. Get the technical details agreed before fixing a date for the groundworks team.

Check whether another type of notice also applies

The foundations may be section 6 work, while a new wall on the boundary can raise a separate section 1 issue. Cutting a beam pocket into an existing shared wall may instead fall within section 2. These are different legal triggers and notice periods; a single generic “extension notice” is not always adequate.

Programme the groundwork realistically

Section 6 generally requires at least one month’s notice. Allow time for an adjoining owner’s response and possible surveyor involvement rather than assuming the trench can be dug on the first planned date. If an adjoining owner dissents, the statutory dispute procedure is a separate step from simply serving the notice.

If your plans are still sketchy

Ask your designer for three things first: an accurate site plan, proposed foundation depths and the position of neighbouring buildings. Those answers determine whether you need specialist excavation-notice help. Do not buy an unsupported notice template before you know which section of the Act is relevant.

Scope of this guide: General information for England and Wales, not individual legal or engineering advice. The free checker and £4.99 notice builder cover supported notice types only. The tool does not prepare section 6 excavation notices or surveyors’ awards; work already begun and active disputes may need professional advice.

Not sure whether notice is needed?

Use the free checker to understand the relevant work. For section 6 excavation, completed work or an active dispute, seek independent advice; the £4.99 builder is not a suitable remedy.

Read the notice requirements ↗

Continue with a related guide

Which measurements matter?

MeasurementWhy it mattersWho should confirm it?
Horizontal separationWhether the excavation is within 3 m or 6 m of a neighbour's building or structureArchitect / surveyor
Proposed trench depthHow deep the new foundation will goGroundworks designer / engineer
Neighbouring foundation depthNeeded to assess the section 6 depth conditionsEngineer, using reliable evidence
45-degree lineAdditional test for qualifying excavations within six metresStructural engineer

Being within three metres is not the entire legal test. Section 6(1) also looks at whether the proposed excavation goes deeper than the bottom of the neighbour's foundations. The six-metre test involves a specified 45-degree line.

What to request from your engineer

Ask for a foundation section showing existing and proposed ground levels, the location of neighbouring structures, expected trench depths and any underpinning or safeguarding measures. A rough sketch with a line labelled “new foundations” is unlikely to settle whether section 6 applies.

If the design changes after groundwork starts, ask the engineer to review the notice position. The original notice must accurately describe the proposed works. Our £4.99 builder does not prepare section 6 notices or the mandatory excavation drawings; the relevant GOV.UK model is in the official booklet.

References

Section 6 ↗ · GOV.UK party wall booklet ↗

Researched and published 29 October 2026. Always check the details of your particular project.